EBMUD, Main Wastewater Treatment Plant Digester Upgrade, Phase 2

The EBMUD Digester Upgrade Project, Phase 2, included:  rehabilitation of four existing two million gallon digesters by replacing the floating covers with fixed covers, adding internal mixers and new mechanical pumps and piping; rehabilitation of seven existing two million gallon digesters my adding mechanical pumps and piping; conversion of two secondary digesters to primary; construction of …

EBMUD, Main Wastewater Treatment Plant Digester Upgrade, Phase 2 Read More »

Patterson Irrigation District Fish Screen Intake

Construction of a new fish screening facility on the San Joaquin River.  The work involved construction of a pile-supported 195 cubic feet per second pump station with a concrete constructed frame and top deck.  The structure had fish screens mounted on the face on the river side with a brush cleaning system and sedimentation system as ancillary components …

Patterson Irrigation District Fish Screen Intake Read More »

Initiate and Complete Construction of Napa Creek Site

This project, which occurs throughout residential and business areas of Napa, California, required great sensitivity to the local residents while maintaining water quality in the Napa Creek and the Napa River.  Extensive shoring was utilized in order to protect buildings adjacent to the project with a close adherence to vibration limits.  Stream bed restoration of Napa Creek was central to the project …

Initiate and Complete Construction of Napa Creek Site Read More »

O’Shaughnessy Dam Electrical and Mechanical Upgrade

PrōVen replaced the water piping and the mechanical supports at the O’Shaughnessy Dam; and installed new conduits, wiring, switches, and junction boxes as necessary to comply with National Electric Code.  PrōVen also installed all new hydraulic systems for the gate valves operating flow for the entire dam.  Panel boards and miscellaneous electrical items as well …