- PROJECTS
- TRANSPORTATION
- WATER RESOURCES
- Victoria Canal Intake and Pump Station
- Canal Modifications South Bay Aqueduct Enlargement
- San Francisquito Creek Storm Water Pump Station
- Colma Creek Flood Control Channel Wall Repair Project
- Patterson Irrigation District Fish Screen Intake Project
- Main Waste Water Treatment Plant Digester Upgrade, Phase 2
- Main Waste Water Treatment Plant Grit System Improvements
- 4th Water Storage Tank and Booster Pump Station Modification
- ENVIRONMENTAL RESTORATION
- POWER
- FEDERAL
- GEOTHERMAL
Home >> Water Resources >> Colma Creek Flood Control Channel Wall Repair Project
Colma Creek Flood Control Channel Wall Repair Project
This project included the repair and upgrade of a section of the Colma Creek at Spruce Avenue Bridge. The existing concrete wall was removed and replaced with a concrete "U" channel, which created a concrete floor where the existing earthen bottom was. ProVen also replaced the failing walls with new ones. The U-shaped wall construction required temporary support and dewatering. Temporary support was provided by steel sheet piles driven to adequate depths below the excavation. Horizontal bracing for the sheet piles on the channel side was needed due to retained heights of the land side.
| Location: | Upstream Spruce Avenue South San Francisco, CA |
| Start Date: | June 2011 |
| Completion Date: | September 2011, 75 working days |
| Original Contract: | $2,155,280 |
| Final Amount: | Currently under construction |
| Owner: | San Mateo County Department of Public Works 400 County Center Redwood City, CA 94063 Mark Chow, Project Manager 650-363-4100 mchow@co.sanmateo.ca.us |
| Engineer: | County of San Mateo Department of Public Works |