Broadway Brommer Multi-Use Path and Bridge

Project consisted of a 350-feet long, stress-ribbon, pedestrian suspension bridge with concrete abutments, 100-feet deep ground anchors and CIDH piles, a 70-feet long, pre-engineered bridge with concrete abutments supported on CISS pipe piles; 1,200 linear feet of pervious concrete pathway; timber lagging wall with H piles; MSE walls and earthwork; asphalt and concrete walkways, including striping; hydroseeding and related site lighting.

Start Date: November 2013
Completion Date: October 2014, 206 working days
Contract Value: $5,376,000
Owner: City of Santa Cruz, Public Works Department
Contract No. RPSTPLE-5025 (57)
Engineer: City of Santa Cruz
Public Works Department