March 2015

Patterson Irrigation District Fish Screen Intake

Construction of a new fish screening facility on the San Joaquin River.  The work involved construction of a pile-supported 195 cubic feet per second pump station with a concrete constructed frame and top deck.  The structure had fish screens mounted on the face on the river side with a brush cleaning system and sedimentation system as ancillary components […]

Patterson Irrigation District Fish Screen Intake Read More »

Initiate and Complete Construction of Napa Creek Site

This project, which occurs throughout residential and business areas of Napa, California, required great sensitivity to the local residents while maintaining water quality in the Napa Creek and the Napa River.  Extensive shoring was utilized in order to protect buildings adjacent to the project with a close adherence to vibration limits.  Stream bed restoration of Napa Creek was central to the project

Initiate and Complete Construction of Napa Creek Site Read More »