PrōVen provided an eight-million gallon water storage tank and installed solenoid pilot valves on each of the existing three tanks; constructed new pavement and driveway, fencing, landscaping, and landscape irrigation. The Booster Pump modifications included 24-inch suction manifold replacement, new gate valves, a new sump pump with valve and discharge piping, and installed electrical service to the Booster Pump station from existing PG&E transformer, two new 125 HP variable frequency drive electric motors and pumps. PrōVen also removed and replaced two 24-inch gate valves, two 20-inch gate valves and one 16-inch gate valve.
Location: | 3420 East Third Avenue Foster City, California |
Start Date: | June 2004 |
Completion Date: | November 2005, 475 calendar days |
Contract Value: | $8,261,508 |
Owner: | City of Foster City / Estero Municipal Improvement District |
Engineer: | Brown and Caldwell |