EBMUD, Mokelumne Aqueducts Interconnection
Project involved the procurement and installation of large, up to 84 inches, diameter valves and piping in the Sacramento River Delta at seven different locations to improve the reliability of the aqueducts. Cast-in-place concrete vaults were built as part of the contract to enclose the valves at several of the location. Large diameter, up to […]
EBMUD, Mokelumne Aqueducts Interconnection Read More »