San Francisco-Oakland Bay Bridge Toll Plaza Improvements

This project is an element of the overall enhancement of the eastern span reconstruction of the San Francisco-Oakland Bay Bridge.  Upgrading included the recladding of the canopy structure, replacing the crash cushions, removing existing pump station building, constructing a new pump station building over existing concrete slab, Stairway No. 7 removal, and painting the toll booths concrete […]

San Francisco-Oakland Bay Bridge Toll Plaza Improvements Read More »

BART Earthquake Safety Program, Station Structures – C Line

ProVen retrofitted three BART stations along the C-Line, connecting Oakland to Bay Point: Orinda, Walnut Creek, and Pleasant Hill.  These retrofits entailed the respective excavations of all the station’s footings, surface demolition of columns, and forming around and drilling into all bent caps, followed by casting new reinforced concrete members and wrapping aforementioned columns in carbon

BART Earthquake Safety Program, Station Structures – C Line Read More »

Broadway Brommer Multi-Use Path and Bridge

Project consisted of a 350-feet long, stress-ribbon, pedestrian suspension bridge with concrete abutments, 100-feet deep ground anchors and CIDH piles, a 70-feet long, pre-engineered bridge with concrete abutments supported on CISS pipe piles; 1,200 linear feet of pervious concrete pathway; timber lagging wall with H piles; MSE walls and earthwork; asphalt and concrete walkways, including

Broadway Brommer Multi-Use Path and Bridge Read More »

Guadalupe River Project Replacement of UPRR Bridges 3 & 4

This project included construction of a two-track railroad bridge and associated approaches, a vehicular bridge, a pedestrian undercrossing, a maintenance road and environmental restoration features along the Guadalupe River between the former UPRR Bridge No. 3 and UPRR Bridge No. 4 in San Jose, California.  Bridge construction necessitated that the environmentally sensitive Guadalupe River flows be

Guadalupe River Project Replacement of UPRR Bridges 3 & 4 Read More »